Preparations for the installation: 1 1 – The panels acclimatize before starting the installation, the flooring in the room, where it is installed or to be adapted in a room with the same climatic conditions. Acclimatization will be as follows: flat in unopened boxes, for a period of at least 24 hours with an interval of at least 50 cm on the walls to a temperature of at least 18 ° C in a sealed surface temperature of at least 15 ° C with a relative humidity between 40% and 65% 1 2 – Installing Officer; floor looks its best when the blades are installed in parallel to the floor incident light through the windows. The Facility Management is only required if you install a parquet floor board. In this case, you must install the ground at an angle of 90 degrees on the stage floor or a hardwood surface of hardboard or plywood. 1. 3 Plotting the first row, after determining the best layout of the floor and the wall, measure the width of the room and divide it by the width of the panels of floor coverings in order to determine the number of rows and width of the last line. If the last line is determined, broadly, less than 60 mm should be adjusted in length by the first row. 1. 4 Plotting of expansion joints; Since laminate flooring is made up of organic matter, it is subject to certain movement behaviors (retraction / extension) due to changes in climatic conditions. It is necessary to make holes for the 10mm expansion in all parts of the structure I leave e. walls, door frames, stairs, around the pipes. 1. 5 Plotting the transition moldings must be due to shrinkage and expansion behavior of the soil, install transition moldings in the following areas: access to all the door on any single track sections and / or over 10 m (33 ft) of the installation process: Check all the panels for possible hurt or flaws. Make sure that the difference between the tongue and throat on the panel. Start the installation of the first row of the left-hand corner of the room with the language of both sides of the panel, pointing toward the wall. Place a spacer between the side walls of floor and wall to provide a suitable space for expansion. Close the control panel second to the first hearing indirectly with a hammer and a block button, add headers counseling. Take the last record of the first row to the length required (up language) for the language and cut. Start the second row with the cut the last scene of the first row. Always make sure that the average length of 500 mm, not cut, and another room that is greater than 500 mm long. Start all lines with the following pieces cut in the previous line. Close the second row by the first end lock the new panel at an angle to the panel previously installed, then in a horizontal position then lock indirectly fueled with a hammer and a block button, joining Descent Advisory header. Warning ! A floor is considered level if the height difference to be stabilized less than 2 mm over a distance of 2. 5 linear feet. Differences above this level must be before laying the underlay. compensators and plotted movement with laminate flooring, it is essential that all floors have an expansion gap of 10 mm around the perimeter of the floor and fixed points in the settlement needs. Without this precaution, go the ground and going nowhere. This can lead to extreme levels of pressure pressure upwards and outwards, lifting and soil.
You must be logged in to post a comment.
Powered by Yahoo! Answers